Power System Studies & Simulation



Quick Intro about Service ( S2 )
Power System Analysis and Simulation: Improving Your Electrical Setup
Our Power System Studies & Simulation services at URJA assist clients in the commercial, industrial, and renewable energy sectors in guaranteeing safe, effective, and regulatory-compliant power flow. Our simulations, which range from voltage analysis to fault-level computations, uncover hidden hazards and opportunities for optimization, improving performance and safeguarding capital equipment.
Our professional studies using tools like ETAP and PowerFactory provide clarity and compliance from the start, whether you’re planning a new plant, upgrading infrastructure, or requesting DISCOM/CEIG permission.
- Load Flow Analysis
- Short Circuit & Fault Level Study
- Relay Coordination & Protection Settings
- Arc Flash Hazard Analysis
- Harmonic Analysis
- Grid Compliance & Approval Reports
Have Any Questions?
+91 9737046110
Who Needs This Service ( S3 )
For whom is Power System Studies & Simulation appropriate?
Power system analysis is now a necessary instrument for guaranteeing grid safety, operational effectiveness, and regulatory compliance; it is no longer discretionary. This service is intended to prevent failures, increase dependability, and direct future-ready electrical planning, regardless of whether you’re putting up a new system, increasing capacity, or just looking for optimization.

100% Design engineers and electrical advisors
Make your electrical designs more accurate by using simulation-backed validation. By helping you adjust protective settings, confirm voltage losses, and satisfy IEC, IEEE, and DISCOM requirements, our reports lower redesign risks and expedite approval processes.

Sectors with Captive Power Facilities
Fast fault recovery and continuous electricity are essential for heavy-duty industrial activities. Our simulations keep your equipment and procedures safe and effective by identifying weak points, recommending redundancy measures, and preventing outages.

Renewable Energy Developers (Solar, Wind, Hybrid)
Integration with the grid demands precision. Our simulation reports help solar EPCs and wind developers assess fault levels, ensure transformer and inverter protection, and meet grid code compliance—critical for smooth commissioning and approvals.

Facility Managers & Utility Operators
Running a large facility or utility comes with high stakes. Our power system studies ensure that you’re equipped with data-backed strategies to prevent overloading, reduce downtime, and meet energy audit standards confidently.
Key Deliverables ( S4 )
Important Products We Offer for Power System Analysis Services
Beyond theoretical simulations, we offer thorough, practical insights intended to improve the security, effectiveness, and compliance of your system. Since every study complies with DISCOM, CEIG, IEC, and IEEE standards, accuracy and authority approvals are never compromised.

Comprehensive Power System Analysis Reports
Get high-precision simulation reports using licensed DIgSILENT PowerFactory or ETAP. We tailor Load Flow, Short Circuit, Relay Coordination, Arc Flash, and Harmonic Analysis to reflect your actual site. Our reports meet IEC/IEEE standards and are CEIG, DISCOM, and investor-ready—ensuring confident decisions and smooth project execution.

Better Protection Configuration & Relay Sync
We deliver precise fault level calculations, time-current coordination curves, selectivity analysis, and custom relay settings to ensure reliable protection. Our studies prevent equipment burnout, enable quick fault isolation, and safeguard critical loads—striking the right balance between uptime and safety for both large industrial grids and small solar setups.

Actionable Recommendations & Compliance Notes
Along with simulations, we provide actionable implementation guidance—covering earthing corrections, cable routing, busbar derating, device upgrades, and panel layout improvements. All recommendations align with CEIG, DISCOM, and IEEE standards, ensuring audit readiness. We also supply ready-to-use formats and templates for EPCs, consultants, or in-house teams minimizing rework, delays, and compliance issues.
The Software and Tools We Use
In order to guarantee technical accuracy, grid compliance, and precision in all power system studies, we use industry-standard licensed software. Real-time simulations, intricate fault analysis, and very reliable grid behavior forecasts are made possible by these instruments.
















Process Workflow (Timeline Style) ( S6 )
Our Tried-and-True 4-Step Power System Analysis Method
We adhere to a simplified, accuracy-first approach that ensures timely delivery of electrical simulation results that meet regulatory requirements for CEIG/DISCOM clearances. This end-to-end power system analysis approach guarantees accuracy, documentation preparedness, and quicker project execution—reducing risk and approval delays whether you’re an EPC company, industrial facility, or developer of a solar plant.

Requirement Gathering & Data Collection
We coordinate with your electrical team to collect single-line diagrams (SLDs), load data, equipment specs, and site configurations. If needed, we assist in field data verification to ensure modeling accuracy.

Simulation Modeling in ETAP/PowerFactory
Our engineers model the complete system in ETAP or DIgSILENT PowerFactory. This includes load flow, short circuit, relay coordination, arc flash, or harmonics simulations depending on your project’s goals and authority requirements.

Results Interpretation & Report Drafting
Post simulation, we analyze outcomes and prepare a detailed, authority-ready report. It includes graphs, tables, relay settings, and CEIG/DISCOM compliance formats tailored to your application.

Final Review, Optimization & Handover
We walk your team through the report, explain optimization suggestions, and finalize after feedback. All files, raw data, and settings are handed over for implementation, audit, and approvals.
Case Study / Sample Output ( S7 )
Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Lorem

Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Why ( Service Name ) Matters ( S8 )
The Reasons URJA Consulting Is Your Reliable Power System Studies Partner
Every power system analysis at URJA Consulting benefits from our in-depth subject knowledge, precise simulations, and regulatory understanding. Whether you’re getting ready for internal audits, CEIG approval, or EPC commissioning, our engineering-led methodology guarantees that you receive workable, legal, and implementable solutions as soon as possible.
Specialized knowledge of PowerFactory and ETAP
The two most reputable software systems in the world's power business, ETAP and DIgSILENT PowerFactory, are certified by our simulation experts. This guarantees that our models are highly accurate, technically sound, and appropriate for investigations at the operational and design stages.
Reporting that is ready for regulations
We create reports that adhere to the precise documentation formats that auditors, DISCOMs, and CEIG demand. This will result in fewer inquiries, quicker clearances, and fewer changes saving your project weeks or even months of needless delay.
Throughout Various Projects
From wind parks and solar farms to data centers, smart buildings, and process industries, we use knowledge from more than 100 completed studies to your particular project, assisting you in avoiding problems and improving electrical performance.
Useful Knowledge Beyond Data
Instead of questioning technical interpretations, each report contains useful implementation notes that your EPC or operations team can immediately implement, such as relay setting adjustments, cable rerouting, CT ratio corrections, and earthing upgrades.
Smooth Cooperation with Your EPC and Electrical Teams
To ensure that we accurately model and capture real-world parameters, our engineers maintain constant communication with your site teams, project managers, and design consultants. This expedites final delivery, decreases rework, and fosters confidence.
Quick Reaction, Even for Important Deadlines
Do you have a DISCOM submission deadline or an impending CEIG inspection? URJA provides choices for priority delivery without sacrificing technical depth. To guarantee accuracy and compliance, every report goes through a two-stage internal review process.
FAQ Section ( S10 )
Frequently Asked Questions Power System Studies & Simulation
A Power System Study involves simulating your electrical network to analyze load flow, short circuits, relay coordination, arc flash risks, and harmonics. It’s essential to ensure system safety, regulatory compliance, and optimal performance.
We work with solar/wind EPCs, industrial plants, data centers, hospitals, real estate developers, and utilities. Any site with complex electrical infrastructure can benefit from simulation-based insights.
We use globally recognized tools like ETAP and DIgSILENT PowerFactory to run all electrical simulations. Both are accepted by CEIGs, DISCOMs, and investors.
Yes. Our reports are prepared in formats accepted by CEIG and DISCOM authorities in India, and are regularly used for regulatory submissions and audits.
We typically need the SLD (Single Line Diagram), equipment specs (transformers, breakers, relays), load data, and site layout. Our team helps coordinate with your engineers to collect this.
Yes. We offer on-site data collection or guide your electrical teams remotely to ensure we model accurate real-world parameters.
Depending on the scope, a standard Power System Study is delivered in 10 to 20 working days. Fast-track delivery is available on request.
We perform Load Flow Analysis, Short Circuit Study, Relay Coordination, Arc Flash Hazard Analysis, and Harmonic Analysis, depending on your needs.
Absolutely. We conduct a final walkthrough session with your team, explaining findings, relay settings, and actionable improvements.
While we don’t physically implement relay settings, we provide full coordination charts, fault levels, and setting files that your field engineers or OEM vendors can easily apply.
Both. We conduct studies for new installations (for CEIG approval) and existing plants (for safety upgrades, audits, or performance issues).
We blend engineering depth with regulatory understanding. Our reports are technically rich, compliance-ready, and come with practical advice that helps EPCs, consultants, and investors take clear action.
Benefits of Choosing URJA ( S10 )
The Reasons URJA Is the Best Option for Power System Simulation and Studies
At URJA Consulting, we provide clarity, compliance, and confidence in addition to simulations. Because of their accuracy, speed, and authority-ready paperwork, EPCs, industrial companies, and consultants throughout India rely on our power system study services.

Proficiency with ETAP and PowerFactory
Our certified engineers specialize in ETAP and DIgSILENT PowerFactory, delivering highly accurate, real-world simulations. We ensure compliance with both Indian regulations and global standards like IEEE and IEC—critical for large-scale industrial and infrastructure projects.

DISCOM & CEIG Approval Assurance
All our studies are designed with regulatory approvals in mind. Reports are structured and annotated as per state-specific CEIG, DISCOM, and statutory norms streamlining compliance, minimizing resubmissions, and saving you time and effort.

Project-Specific Engineering Method
We analyze actual SLDs, site loads, utility inflows, cable routes, and protection schemes—instead of relying on generic simulations. This ensures your system assessment aligns with real operating conditions, reducing on-site surprises and maximizing infrastructure ROI.

Quality control and quick turnaround
For industrial projects, deadlines are important. Because of this, we keep a lean, milestone-driven approach that allows for delivery in 10–20 working days without sacrificing the quality of the documentation, engineering review, or simulation depth. Before being submitted, each output is subjected to peer review.

9. Client Testimonials
What Our Clients Say
Upload Resume Form ( S9 )
Are You Prepared to Boost with Accuracy?
Allow URJA Consulting’s knowledgeable staff to assist you with removing electrical hazards, cutting down on downtime, and quickly passing audits. We provide speed, accuracy, and end-to-end support for any type of project, including relay coordination, CEIG-compliant reports, and full system simulations.
Schedule a Free Consultation Call Right Now
No promise. Just an explanation of how we can properly fuel your project.